Site Plans Orlando | Civil Engineering & Development Plans
Orlando's sinkhole-prone areas and diverse development from Lake Nona to Downtown require site-specific engineering solutions. We produce grading, stormwater, utility, and parking designs that meet City of Orlando development review standards.
Site Engineering for Orlando's Sinkhole-Prone Areas and Growth Corridors
Every building project needs a site plan. It shows the building on the lot, parking and circulation, stormwater management, utility connections, landscaping, and grading. The City of Orlando reviews site plans carefully: do parking calculations meet code? Is stormwater detention properly sized? Are buffers and setbacks adequate? Do site access and circulation work?
HBDE creates site plans that pass City review. We calculate parking requirements, design stormwater systems, coordinate utilities, and show proper setbacks and buffers. Our site plans are clear, detailed, and permit-ready.
Fast turnaround. Flat-fee pricing. Coordination with architectural and structural plans. Your site plan is ready for permit submission within days.
Site Plans for Orlando Builders and Property Developers
Site Plans That Pass City of Orlando Review
City of Orlando is particular about site plans. Parking must meet code. Stormwater must be properly managed. Setbacks must comply with zoning. Buffers must protect adjacent properties. Utilities must be shown. Circulation must work.
We create site plans that address all these requirements clearly. We show property lines, setbacks, parking with calculations, stormwater detention/retention, utility connections, grading, and landscape buffers. City reviewers see a complete, code-compliant site plan that's ready to approve.
Parking Layout and Calculation
Orlando code requires specific parking ratios per use: 3.5 spaces per 1000 sq ft for retail, 1 per 250 sq ft for office, 1 per dwelling unit plus guest for residential. We calculate your project's parking requirement, design an efficient layout, and verify ADA accessibility. Your site plan shows clear parking organization that contractors can build.
Stormwater Management Design
Orange County requires stormwater retention or detention for projects that increase runoff. We calculate stormwater volume, design detention ponds or underground retention systems, route drainage, and verify water quality treatment. Florida's sandy soil and seasonal water table make stormwater design important. We get it right.
Orlando Building Department Quick Reference
Site Plans for Residential Additions and Home Projects
Site Plans for Residential Infill in Orlando Neighborhoods
Baldwin Park, Thornton Park, College Park, and SODO have active infill development. Town homes, duplexes, and small multifamily buildings fit on smaller lots with minimal setbacks. Site plans for these projects need careful parking layout (sometimes shared or structured), efficient stormwater management (often in underground systems), and coordination with existing neighborhood utilities.
We design site plans that fit infill lots efficiently while meeting code. We show parking, stormwater, utilities, setbacks, and access in clear, coordinate-friendly detail.
Site Plans for Mixed-Use Downtown and Large Developments
The former Orlando Sentinel redevelopment site, Church Street corridor projects, and downtown infill need complex site plans: ground-floor retail with upper-floor residential or office, structured or underground parking, public plaza or open space, shared utilities, and coordination with adjacent development.
We design sophisticated site plans for large, complex projects. We show building footprints, parking structures, open space, utilities, grading, and phasing if needed. Our site plans integrate with architectural and civil engineering design.
Site Plans for Residential Additions and Home Projects
Even home additions and renovations in College Park or Baldwin Park need site plans showing the property, existing and new structures, setbacks, utilities, and drainage. We create simple, clear site plans for residential projects so you have clarity on what's where.
Why Choose HB Design and Engineering in Orlando
Complete Civil Engineering. Parking and Stormwater.
- We don't just show a box for your building. We design parking, calculate stormwater detention, coordinate utilities, and design grading. Complete site engineering.
Code-Compliant Parking and Stormwater
- We know Orlando's parking requirements and stormwater standards. We work with licensed engineers on system design that code officials approve.
Efficient Site Layout for Infill and Complex Projects
- Orlando's infill neighborhoods require creative site planning. We maximize usable space while meeting setback, parking, and stormwater requirements.
Fast Turnaround and Permit-Ready Plans
- Site plans are ready in 5-10 days. Clear, code-compliant, and ready for City of Orlando review.
City of Orlando Permitting Services Division
(407) 246-2271
Average Review Time:
15-20 business days
Pro Tip:
City of Orlando requires stormwater calculations and drainage certification with all site plans. We include these documents with our site plan submission.

Site Plans Project Types in Orlando
• Single-family home lots and site plans
• Duplex and town home site plans
• Small multifamily residential developments
• Commercial office and retail site plans
• Mixed-use downtown developments
• Industrial and warehouse site plans
• Parking lot and structured parking design
• Public plaza and open-space coordination
FAQs
What is included on a site plan?
Site plan shows the property boundary, proposed building(s), parking layout with number of spaces, stormwater management (detention pond, retention system, or swales), utility connections (water, sewer, electric, gas), grading and drainage, setbacks and buffers, and site circulation (roads, sidewalks, driveways).
How do you calculate parking requirements in Orlando?
We use Orlando's zoning code, which specifies parking ratios per use: 3.5 spaces per 1000 sq ft retail, 1 space per 250 sq ft office, 1 per dwelling unit plus 0.25 guest for residential, etc. We calculate your requirement and design a layout to meet it.
What does stormwater design include?
We calculate the volume of stormwater runoff for your project, design a detention or retention system to manage that volume, and show drainage routing to the system. Most Orlando projects need stormwater management due to impervious surface area.
Can you design a site plan for an infill project on a tight lot?
Yes. Infill lots in Baldwin Park, Thornton Park, and SODO are often constrained. We optimize site layout to fit your building, parking, stormwater, and utilities within setback and code limitations.
How long does site plan design take?
Most site plans are complete in 5-10 days. Simple residential projects take less time. Complex multifamily or mixed-use projects might take a bit longer, but we prioritize so you move forward efficiently.
Are site plans included in the permit set?
Yes. Site plans are a required component of any development permit application in Orlando. We include the site plan, grading plan, stormwater design, and utility plan in your complete permit package.
Other HB Design and Engineering Services in Orlando
We Also Serve These Nearby Areas
- Tampa: 90 miles west; we design site plans for Tampa Bay commercial and residential developments.
Jacksonville: 140 miles north; major market for civil site engineering and development planning.
Gainesville: 120 miles north; university and mixed-use site planning and civil engineering.
Sarasota: 150 miles south; resort and luxury residential site planning and civil design.
Clearwater: 80 miles west; beach community commercial and hospitality site planning.
Need a Site Plan for Your Orlando Project?
Tell us about your development: the lot size, proposed use, and timeline. We'll create a site plan showing parking, stormwater management, utilities, and grading. Ready for permit within days.

